Project Details

Graylands Housing Development Project Image

Graylands Housing Development

PowerSum Private Limited is currently undertaking major High Voltage (HV) and Medium Voltage (MV) electrical reticulation works at the Graylands Housing Development located in Stoneridge, Harare South. This long-term project supports residential expansion by delivering modern, reliable, and compliant electrical distribution infrastructure.

As one of Harare’s rapidly growing settlements, Graylands requires a durable and future-ready electrical system capable of supporting thousands of residential units, commercial spaces, schools, and community facilities. Our engineering team designed and executed a complete reticulation solution built to withstand load growth, environmental factors, and urban expansion.

Project Year: 2025 – Present    |    Location: Stoneridge – Harare South

The project continues to elevate the reliability and safety of electricity supply within the growing housing development, supporting community growth, economic activity, and residential comfort.

Scope of Work

  • Full High Voltage (HV) and Medium Voltage (MV) electrical reticulation design and installation.
  • Installation of transformers, switchgear, and distribution poles.
  • Laying underground cables and overhead conductors for residential supply lines.
  • Street lighting power provisioning and network planning.
  • Comprehensive testing, commissioning, and ZETDC compliance procedures.

Project Objectives

  • Provide a stable and future-proof electrical distribution network for a growing residential area.
  • Support safe, efficient, and compliant electricity access for all housing units.
  • Reduce electrical faults and ensure continuous energy supply for residents.
  • Enable scalability as more homes and community facilities are built.

Project Outcomes

  • A robust HV/MV reticulation network capable of supporting long-term residential growth.
  • Increased safety and reliability of electrical supply for all households.
  • Reduced outages and improved system efficiency across the development.
  • Strong compliance with ZETDC and national housing electrification standards.
Bakers Inn Project Image

Bakers Inn Project

PowerSum Private Limited was contracted to undertake full-scale plant maintenance, substation installation, and overhead lines construction at the Bakers Inn production facility located in Graniteside, Harare. This project forms part of the client’s modernization and energy optimization plan aimed at improving industrial reliability and enhancing production efficiency.

Our team deployed engineers and technicians specializing in electrical and mechanical plant systems, delivering integrated maintenance solutions, electrical reticulation upgrades, and structural improvements to the facility’s energy infrastructure. The project also involved the installation of overhead power lines to stabilize distribution across the plant.

Project Year: 2025    |    Location: Bakers Inn – Graniteside, Harare

Through expert workmanship, adherence to safety standards, and precise engineering execution, the project continues to support reliable plant operations and reduce power-related downtime for one of Zimbabwe’s major industrial baking facilities.

Scope of Work

  • Full plant maintenance for electrical and mechanical systems.
  • Construction and commissioning of an industrial power substation.
  • Overhead line construction to enhance power distribution stability.
  • Electrical infrastructure reinforcement and system optimization.
  • Safety and compliance audits across the production facility.

Project Objectives

  • Improve energy reliability and reduce production downtime.
  • Increase electrical safety and alignment with industrial standards.
  • Modernize plant electrical systems and enhance performance.
  • Support efficient load management for industrial equipment.

Project Outcomes

  • Enhanced operational reliability for Bakers Inn production facilities.
  • Improved electrical distribution stability and load capacity.
  • Better compliance with industrial electrical safety standards.
  • Reduced downtime and improved plant operational efficiency.
Swazy Granite Project Image

Swazy Granite Project

PowerSum Private Limited was engaged to upgrade, modernize, and stabilize the electrical systems at Swazy Granite in High Glen, Harare, an industrial granite processing facility requiring high-load power distribution and system reliability. The project involved construction of a new substation, advanced plant maintenance, and optimization of electrical reticulation to support heavy-duty industrial machines.

The client required a robust and efficient electrical backbone capable of supporting continuous production cycles, high startup currents, and industrial cutting machinery. Our engineering team delivered a complete power infrastructure upgrade while improving energy efficiency, safety standards, and equipment life cycle.

Project Year: 2024    |    Location: High Glen – Harare

The Swazy Granite project positioned the facility for higher productivity, reduced downtime, and improved compliance with Zimbabwe’s industrial energy and safety requirements.

Scope of Work

  • Construction and commissioning of a new industrial electrical substation.
  • Full mechanical and electrical plant maintenance for granite cutting machinery.
  • Electrical fault diagnosis, system tracing, and equipment restoration.
  • Power reticulation upgrades for improved load distribution.
  • Safety and compliance checks in line with industrial electrical standards.

Project Objectives

  • Strengthen electrical power supply to support heavy industrial machinery.
  • Reduce operational disruptions and power-related faults.
  • Improve production efficiency through stable electrical systems.
  • Ensure plant compliance with industrial safety and energy regulations.

Project Outcomes

  • Stable and enhanced electrical performance for industrial granite operations.
  • Increased equipment lifespan due to efficient power supply.
  • Reduced power faults, breakdowns, and system overload incidents.
  • Improved productivity and operational efficiency for Swazy Granite.
Mid-Winter Mine Project Image

Mid-Winter Mine Project

PowerSum Private Limited was commissioned to carry out comprehensive plant maintenance and electrical installation works at Mid-Winter Mine in Kadoma. The mine required reliable power infrastructure capable of supporting heavy mining machinery, high-current startup loads, and continuous mineral processing operations.

The project focused on optimizing electrical systems, upgrading outdated infrastructure, installing new equipment, and implementing safe and efficient power reticulation suited for mining environments. Our engineering team ensured that the mine’s operational demands were matched with a stable and sustainable power system.

Project Year: 2024    |    Location: Kadoma – Zimbabwe

Through strategic upgrades, professional installations, and improved system reliability, Mid-Winter Mine achieved enhanced productivity, reduced downtime, and safer working conditions for all electrical operations.

Scope of Work

  • Installation of new electrical systems for mining and processing equipment.
  • Preventive and corrective maintenance of electrical and mechanical plant machinery.
  • Upgrading outdated electrical distribution boards and control systems.
  • Load management improvements for mining operations.
  • Safety inspections, compliance checks, and system testing.

Project Objectives

  • Improve electrical safety and reliability for mining operations.
  • Reduce downtime by implementing efficient preventive maintenance.
  • Support high-demand mining equipment with stable power supply.
  • Modernize electrical systems for better operational efficiency.

Project Outcomes

  • Increased mining productivity through improved electrical performance.
  • Reduced operational downtime caused by electrical faults.
  • Enhanced workplace safety for mine personnel and equipment.
  • Modernized and future-ready electrical infrastructure for mining operations.
Fivo Beverages Project Image

Fivo Beverages Project

PowerSum Private Limited was contracted by Fivo Beverages to undertake major electrical infrastructure development at their manufacturing plant located in Nharira, Norton. The project involved overhead line construction and substation development to provide the facility with a strong, stable, and efficient power supply suitable for beverage production and industrial processing.

As Fivo Beverages expanded production capacity, their power demand increased significantly. Our engineering team designed and implemented a robust electrical solution focusing on high-load distribution, safety compliance, and future scalability. The installation supports continuous operation of bottling lines, refrigeration systems, motors, and industrial-grade machinery.

Project Year: 2025    |    Location: Nharira – Norton

This project played a critical role in enhancing Fivo Beverages’ production reliability, lowering system faults, and ensuring the facility operates on a modern, compliant, and energy-efficient electrical network.

Scope of Work

  • Design and construction of overhead power distribution lines.
  • Construction and commissioning of a medium-voltage substation.
  • Electrical reticulation upgrades for high-load beverage production equipment.
  • Earthing, protection, and power safety system installations.
  • Testing, commissioning, and certification for full industrial compliance.

Project Objectives

  • Provide stable and reliable power supply for industrial beverage production.
  • Reduce downtime caused by electrical fluctuations and system overloads.
  • Enhance operational efficiency through optimized power distribution.
  • Deliver a durable, safe, and scalable power infrastructure for future expansion.

Project Outcomes

  • Improved power reliability, enabling uninterrupted beverage production.
  • Reduced power faults and increased system efficiency across the plant.
  • Enhanced operational safety and compliance with national energy standards.
  • A modernized electrical infrastructure ready for future expansion at Fivo Beverages.